Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
Olympia City Council approved a SEPA determination for the West Bay Marina Replacement projectNo usable supporting receipt β unverified.
- β
The SEPA determination was approved on July 24, 2026This receipt does not establish the claimed decision.βIssued: 2026-07-24β
- β
The project involves removing and replacing solid decked piersβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The project involves replacing rampsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The project involves replacing floatsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The project involves replacing creosote-treated wood pilingsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The project involves replacing solid decked piers with updated materialsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials. The project consists of installation of new piers, ramps, piling and float systems with up-to-date environmental standards in a slightly new configuration. Removal of an unsafe overwater dock and repair to existing domestic water line.β
- β
The project involves replacing ramps with updated materialsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The project involves replacing floats with updated materialsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The project involves replacing creosote-treated wood pilings with updated materialsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials.β
- β
The work will repair an existing domestic water lineβRemoval of an unsafe overwater dock and repair to existing domestic water line.β
- β
The work will remove an unsafe overwater dockβRemoval of an unsafe overwater dock and repair to existing domestic water line.β
- β
The project is located at 2100 West Bay Dr NWβLocation: 2100 WEST BAY DR NW, Olympiaβ
- β
Public comments for the project will be accepted until August 7, 2026βComments due: 2026-08-07β
- β
The city's SEPA document states the new infrastructure will meet 'up-to-date environmental standards'βProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials. The project consists of installation of new piers, ramps, piling and float systems with up-to-date environmental standards in a slightly new configuration.β
- β
The project will be in a slightly new configurationβThe project consists of installation of new piers, ramps, piling and float systems with up-to-date environmental standards in a slightly new configuration.β
- β
A previous SEPA determination for the marina was made in 2014No usable supporting receipt β unverified.
- β
The marina serves local boaters and residentsNo usable supporting receipt β unverified.
- β
The marina serves residents who use the waterfront areaNo usable supporting receipt β unverified.
- β
The replacement project aims to address safety concerns with the current structureNo usable supporting receipt β unverified.
- β
The replacement project aims to meet current environmental regulationsβProposal to remove and replace the solid decked piers, ramps, floats and creosote treated wood piling and replace with up-to-date materials. The project consists of installation of new piers, ramps, piling and float systems with up-to-date environmental standards in a slightly new configuration.β
- β
Public comments will help shape the final project detailsNo usable supporting receipt β unverified.
- β
Public comments will help shape the final project details before construction beginsNo usable supporting receipt β unverified.