← The Olympia Wire
Development

Olympia Seeks Input on Two Development Projects

πŸ”Š Listen Β· narrated by Aiden

Olympia City Council and Thurston County are seeking public input on two development projects with deadlines in August. The city is reviewing a proposal to subdivide 6.17 acres into 21 single-family lots at an unspecified Olympia location, which includes a stream and wetland requiring critical area protection. The project, submitted by Chris Carlson and Hatton Godat Pantier, has a comment deadline of August 19.

Thurston County is also seeking feedback on a bulkhead replacement project at 415 75th Way NE in Olympia. The applicant, Pat Gonzalez, plans to replace a failing concrete bulkhead with a 78-foot structure held by 17 helical anchors. Work will temporarily disturb about 900 square feet of beach, with most construction from uplands. Public comments are due by August 28.

πŸ“„ Source: WA Ecology SEPA β€” Thurston County β€” https://data.wa.gov/resource/mmcb-z6jf.json?countyname=THURSTON
Source receipts8 of 12 claims supported Β· 67%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Olympia City Council and Thurston County are seeking public input on two development projectsNo usable supporting receipt β€” unverified.
  • βœ“
    The city is reviewing a proposal to subdivide 6.17 acres into 21 single-family lotsβ€œSubdivide 6.17 acres into 21 single family lots.”
  • βœ“
    The project includes a stream and wetland requiring critical area protectionβ€œDescription: Subdivide 6.17 acres into 21 single family lots. The site contains a stream and wetland, which will require critical area tracts, additionally a large area of the site is dedicated to stormwater.”
  • βœ“
    The project is submitted by Chris Carlson and Hatton Godat Pantierβ€œApplicant: Chris Carlson, Hatton Godat Pantier”
  • ⚠
    The project has a comment deadline of August 19No usable supporting receipt β€” unverified.
  • ⚠
    Thurston County is seeking feedback on a bulkhead replacement projectNo usable supporting receipt β€” unverified.
  • βœ“
    The bulkhead replacement project is at 415 75th Way NE in Olympiaβ€œLocation: 415 75th Way NE, Olympia”
  • βœ“
    The applicant plans to replace a failing concrete bulkhead with a 78-foot structureβ€œReplacement of an existing, failing concrete bulkhead within the same footprint (in kind). The replaced bulkhead is 78 feet long and 7-8 feet in height and will be held in place by 17 helical anchors.”
  • βœ“
    The structure is held by 17 helical anchorsβ€œThe replaced bulkhead is 78 feet long and 7-8 feet in height and will be held in place by 17 helical anchors.”
  • βœ“
    Work will temporarily disturb about 900 square feet of beachβ€œApproximately 900 square feet of beach will be temporarily disturbed by the construction activities.”
  • ⚠
    Most construction will be from uplandsNo usable supporting receipt β€” unverified.
  • βœ“
    Public comments are due by August 28β€œComments due: 2026-08-28”

The Olympia Wire is free. Get Olympia's news delivered every morning.