Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
Olympia City Council issued a SEPA Determination of Nonsignificance (DNS) for the Briggs Professional Suites projectNo usable supporting receipt β unverified.
- β
The DNS for the Briggs Professional Suites project was issued on August 6βIssued: 2026-08-06β
- β
The Briggs Professional Suites project will build a new two-story commercial buildingβDescription: New 2-story commercial building with associated parking lot, sidewalks, and future building pad.β
- β
The Briggs Professional Suites project will be built at 4510 Maple Ln SEβLocation: 4510 Maple Ln SE, Olympiaβ
- β
The Briggs Professional Suites project will include a parking lotβDescription: New 2-story commercial building with associated parking lot, sidewalks, and future building pad.β
- β
The Briggs Professional Suites project will include sidewalksβDescription: New 2-story commercial building with associated parking lot, sidewalks, and future building pad.β
- β
The Briggs Professional Suites project will include a future building padβDescription: New 2-story commercial building with associated parking lot, sidewalks, and future building pad.β
- β
M & T Advanced Properties is the applicant for the Briggs Professional Suites projectβApplicant: M & T Advanced Properties
Location: 4510 Maple Ln SE, Olympia
Description: New 2-story commercial building with associated parking lot, sidewalks, and future building pad.β
- β
Public comments on the Briggs Professional Suites project are due by August 27βComments due: 2026-08-27β
- β
The Balbo Retaining Wall and Bulkhead project at 2640 Island Dr NW also received a DNSNo usable supporting receipt β unverified.
- β
The Balbo Retaining Wall and Bulkhead project involves repairing an existing bulkheadβThe applicant to repair of an existing bulkhead that will include the installation of pressure treated lumber lagging wall, a concrete retaining wall, and anchoring methods including helical anchors and injected expandable polyfoam.β
- β
The Balbo Retaining Wall and Bulkhead project will include a pressure treated lumber wallβThe applicant to repair of an existing bulkhead that will include the installation of pressure treated lumber lagging wall, a concrete retaining wall, and anchoring methods including helical anchors and injected expandable polyfoam.β
- β
The Balbo Retaining Wall and Bulkhead project will include a concrete retaining wallβThe applicant to repair of an existing bulkhead that will include the installation of pressure treated lumber lagging wall, a concrete retaining wall, and anchoring methods including helical anchors and injected expandable polyfoam.β
- β
The Balbo Retaining Wall and Bulkhead project will include helical anchorsβThe applicant to repair of an existing bulkhead that will include the installation of pressure treated lumber lagging wall, a concrete retaining wall, and anchoring methods including helical anchors and injected expandable polyfoam.β
- β
Comments on the Balbo Retaining Wall and Bulkhead project close August 13βComments due: 2026-08-13β
- β
The Byers Dock Replacement at 4017 116th Ave SE will replace an unpermitted dockβRemove unpermitted dock and install new pre-fabricated 4 ft. by 25 ft. pier supported by six 3β galvanized steel pilings, a 4 ft. by 20 ft. ramp supported by four 3β pilings and an 8 ft. by 25 ft. float on the northwest side of Offut Lake.β
- β
The Byers Dock Replacement at 4017 116th Ave SE will include a new structure on Offut LakeβRemove unpermitted dock and install new pre-fabricated 4 ft. by 25 ft. pier supported by six 3β galvanized steel pilings, a 4 ft. by 20 ft. ramp supported by four 3β pilings and an 8 ft. by 25 ft. float on the northwest side of Offut Lake.β
- β
Thurston County is reviewing the Byers Dock Replacement under a CONSULT processβType: CONSULT
Applicant: Brittany Morgan Matter
Location: 4017 116th Ave SE, Olympia
Description: Remove unpermitted dock and install new pre-fabricated 4 ft. by 25 ft. pier supported by six 3β galvanized steel pilings, a 4 ft. by 20 ft. ramp supported by four 3β pilings and an 8 ft. by 25 ft. float on the northwest side of Offut Lake. The zoning is Rural Residential Resource 1/5 (RRR 1/5) and the Shoreline Designation is Rural.β
- β
Comments on the Byers Dock Replacement are due August 30βComments due: 2026-08-30β